Showing posts with label breakage. Show all posts
Showing posts with label breakage. Show all posts

Monday, June 24, 2013

Basics of open cast blasting


  1.  Rock usually takes "60 ms(milli-second )" to move around "1 m".
  2. A blasting is said to healthy when it is free from fly rocks, with minimum vibration and boulders up to 1 %.
  3. Drilling and blasting cost should be within 22 % of the contract price.
  4. Minimum stemming of 3.5 meter should always be maintained.
  5. Efforts should be made to complete the blasting within 800 ms.
  6. Range of burden/spacing should be between 0.5 and 1.0.
  7. For optimum breakage, bench height/burden should be around 2.5.
  8. For satisfactory throw, bench height/burden should be greater than 2.5.
  9. Bench height should be between 10 and 12 m. 
  10. If the stemming height is 1.2 to 1.5 times the burden then fly-rock can easily be controlled.
  • bold parts are thumb rules.

Rock type(based on RMR)
Burden(in meter)(B)
Spacing(in meter)
Stemming(in meter)
Very poor
51 X D*
1.45 X B
1 X B
Poor
44 X D
1.34 X B
0.95 X B
Medium
37 X D
1.25 X B
0.95 X B
High
29 X D
1.19 X B
1.1 X B
Very high
23 X D
1.14 X B
1.1 X B

  • D: diameter of hole in mm (100,160,…..)